Call Us Anytime
+90 549 732 77 07We bring to your attention our new project GOLDSUN 13.
A small club house with all the necessary infrastructure will be located near the city school and within walking distance from the center of Mahmutlar.1057 ada 7 parsel 622 m2 To the sea 850 meters.
The residence will consist of 1 block, 5 floors in total, 25 apartments.
Layouts:
1+1 55 m2
Penthouses 2+1 110 m2
The apartments will be fully finished: kitchens, equipped bathrooms, bathroom walls - ceramic tiles of high quality Turkish brands, walls painted with waterproof breathable "satin" paint, pvc windows and sliding doors with double glazing, high quality modern ceramic flooring, interior panel doors, steel entrance door, ice lighting and central lighting, electrical fittings, air conditioning outlets.
Start of construction - 01.12.2022
Completion of construction - 01.05.2024
Down payment - 40%
Installment payment during construction